SANFU SHIPBUILDINGS' 11,000 DWT multi-purpose vessel’s blocks erection
Release time:2025-06-20 Number of views:

At 13:48pm on 20 June 2025, a 11,000DWT MPV(Hull No. SF130223) built by Sanfu shipyard for a German shipowner held the blocks erection ceremony at the company's 3# slipway, where representatives of the shipowner, LR Classification Society and Sanfu shipyard attended the blocks erection ceremony.

1300-010.jpg 

The ship has an overall length of 149.95 metres, a vertical length of 143.05 metres, a beam of 23.20 metres, a depth of 10.5 metres, a design draught of 8.50 metres, a speed of 15.5 knots, and is equipped with 250-tonne*2 sets of Kringle cranes, which are classed by LR.

The 11000DWT multi-purpose vessel series is the key project of the company in 2025. According to statistics, this month the series of vessels has completed the delivery of one vessel, the launching of one vessel and one vessel on the ship's slipway, and the three key nodes have been reached on schedule, marking the steady progress of the project.

 


Copyright © 2021 - Taizhou Sanfu Heavy Industry Group Co., Ltd   备案号:苏ICP备11000697号-2 腾云建站仅向商家提供技术服务 Website Map