At 8:18 a.m. on 27th June 2024, a 3500TEU dual-fuel (LNG+MGO) container ship built by Sanfu shipyard for a German owner was successfully launched at 4# shipyard of the company.
The ship has an overall length of 248.00m, plumb length of 236.50m, beam of 35.20m, depth of 19.2m, design draught of 11.00m, maximum DWT of 51,000 tonnes, design speed of 19.5 knots, and is classed by DNV.